Loading
02 – NEOM Base Economy Assets/

02 – NEOM Base Economy Assets

Project Details

As a contractor’s designer, we proudly offer our services to “FIRST FIX” for the construction of the project, which comprises fifteen halls with varying areas, reaching a maximum of 3000 m2.

Our expertise and collaboration with “FIRST  FIX” ensure a seamless execution, allowing for the swift and efficient functionality of each unit. 

Our team’s primary responsibility was to provide comprehensive structural design packages for each building, adhering to the rigorous standards outlined by ASCE (American Society of Civil Engineers) and AISC (American Institute of Steel Construction) codes of practice.

The project presented a unique challenge as we had to develop an efficient structural design capable of withstanding various load effects, including seismic activity, wind forces, temperature fluctuations, as well as dead and live loads.

Moreover, three regulatory authorities meticulously reviewed and revised our work, adding a layer of responsibility to ensure compliance and safety.3


We take great pride in the successful completion of the project, and we invite you to visit these remarkable buildings and experience their exceptional services firsthand.

Location: KSA
Project Type:

Want to hire us?

Mayhob

You cannot copy the content of this page